Taken September 6, 2014, facing what will be the front door. |
We have dirt! Last week, there was a ditch around the perimeter; now on most sides, there is dirt filling in around the foundation. Mike says that he'll need to bring in a bunch more to get the yard even with the foundation. You can begin to get a sense of how high up we will be: In the top picture, I'm standing on the front yard, and those are tree tops in the background. It looks like the view out of our back picture window will be into those tree tops.
![]() |
Taken September 6, 2014, looking into the garage. |
So now for the part I don't care about. While we were out at the site, Mike had some questions about roughing in the basement bathroom. We are planning on setting up the plumbing for a bathroom down there partly because I want a dog wash in the basement (and if you'd seen Durin today, you'd know why this is a necessity!). So Mike wants to know where he should put it. He has a preference, I'm assuming for logistical reasons, but he's not going to move forward without our say-so.
But actually, I don't care. I figure the basement may or may not ever be finished; it's certainly not on my top ten list of upgrades after we move in. And besides, most basements are a hodge-podge of oddly spaced and shaped rooms and dividers. I don't much care if ours joins that company.
![]() |
Sketched September 7, 2014, the basement bathroom, back doors, and dog wash. |
Nope. I don't really care. But I do care that I am on the critical path, and I don't want Mike to be waiting on me. He wants the sketch this week; I'm really busy this week. Now is the kairotic moment.